Report of the Committee on Roads and Transport on the contract agreement between the Government of the Republic of Ghana (represented by the Ministry of Roads and Highways acting through the Ghana Highway Authority) and QGNI Construccciones E Infrastraesturas Globales S.L.U for an amount of Ninety –Six Million ,Three Hundred and Forty Five Thousand and Six United States Dollars and Thirty –Seven Cents US$96,345.37 ( [ equivalent to € 88,000,000.00] ) for the design and construction of bridge over the Black Volta at Buipe , Span 240 M; Lot 2; design and construction of bridge over White Volta at Yapei span 240M; Lot 3 design and construction of bridge over White Volta at Daboya, span 300m
JavaScript is disabled for your browser. Some features of this site may not work without it.
Report of the Committee on Roads and Transport on the contract agreement between the Government of the Republic of Ghana (represented by the Ministry of Roads and Highways acting through the Ghana Highway Authority) and QGNI Construccciones E Infrastraesturas Globales S.L.U for an amount of Ninety –Six Million ,Three Hundred and Forty Five Thousand and Six United States Dollars and Thirty –Seven Cents US$96,345.37 ( [ equivalent to € 88,000,000.00] ) for the design and construction of bridge over the Black Volta at Buipe , Span 240 M; Lot 2; design and construction of bridge over White Volta at Yapei span 240M; Lot 3 design and construction of bridge over White Volta at Daboya, span 300m